S.No. Owner Finish Date Orders / Contracts Details
       
1 Tuwairqi Steel Mills Limited July - 2010 Erection and Installation of Vessels, Steel Structure at DRI Furnace.
2 Tuwairqi Steel Mills Limited July - 2010 Fabrication of Ducts, Misc. Equipment and Misc. Small Structure and Surface preparation & painting works.
3 Tuwairqi Steel Mills Limited July - 2010 Fabrication of Pipe Racks at DRI plant.
4 Tuwairqi Steel Mills Limited July - 2010 Installation and Painting of Pipe Racks, Plant piping and Sand Blasting and Primer piping, at DRI Plant.
5 Pakistan Petroleum Limited June - 2010 Fabrication / Supply of Re-Claimer U Tube Bundle for Bank No. 10 at Purification Plant, Sui Gas Field.
6 National Refinery Limited May - 2010 Fabrication & Supply of One No. C.S. Tube Bundle for Heat Exchanger 13-E-5. (Tender Equiry # D-1-2 / 68 / 2008 - 2009)
7 Mehran Sugar Mills Limited September - 2010 Supply & Fabrication of Juice Clarifier, Evaporator, and Continuous Pan.
  Total Work Order Value    


Past Performances
Project Planning & Control
Quality Control Documentation
Tuwairqui Steel Mills Limited
Pakistan Petroleum Limited.
Mehran Sugar Mills Limited All View