QUALITY MANAGEMENT SYSTEM

FUNCTION OF QC DEPARTMENT:

  • To Prepare the “Inspection & test plans (ITP)”, in accordance with applicable codes.
  • To ensure the quality of material, workmanship and welding procedures in
  • accordance with relevant codes and approved procedures.
  • To check, verify and approve the manufacturing activities according to ITP.
  • To carry out the NDT (such as RT, UT, PT, MT, dimensional checking, hydrostatic and pneumatic testing) and witness the “HOLD” points during manufacturing and maintain the record of  ITP’s Travelers and check lists.
  • To detect the non-conformities and propose the procedures for rectification.
  • To ensure the rectification of non-conformities, according to the approved
  • procedures.
  • To keep the documentary records of Mill test Certificates, material reports,      
  • inspections, tests, non-conformities & their corrections and the M.D.Rs.

TESTING ARRANGEMENTS AVAILIBILITY

N.D.T. Equipment (Available with approved NDT Agency)

  • Radiographic Testing Machine         =        Tech Ops 660, 20 & 100 Curies.
  • Ultrasonic Flaw detector                    =        USK-75 / USL – 32, 0.5 to 10 MHz
  • Magnetic Particle testing Equipment           =        Probe type Yoke,  1000 Amps.

Destructive Testing Equipment & Machines (Available with our approved Agency)

  • Universal Testing Machine
  • Charpy Impact Tester
  • Hardness Tester
  • Spectrometer
  • Pressure gauges testing/calibration bench
  • Measuring Tapes calibration Jig.

Welding Inspection Instruments and Gauges

  • Fillet weld measuring gauges
  • Hi-Low measuring gauges
  • evel measuring gauges
  • DC / AC Ampere meter (Clamp Type Tester)
  • Digital Thermometers (for PWHT temperature checking)

Pressure / Leak Testing Equipment

  • Pump for pressure testing (upto 20,000 PSI)
  • Pressure gauges (upto 16,000 PSI)
  • Compressor for Pneumatic tests (upto 150 PSI)
  • Pressure / holding and relief valves.
Quality Management
System

Quality Management
System


Quality Management System System
Fabrication Sequence
Heat Exchanger
Fabrication Sequence
Pressure Vessel
Fabrication Sequence
Storage Tank
Inspection testing
Plan_0001
Inspection testing Plan Quality Control Policy
Past Performances
Project Planning & Control
Quality Control Documentation
Tuwairqui Steel Mills Limited
Engro Asahi Polymer & Chemicals Ltd.
Lucky Cement Limited All View
10 August 2008
Career Sections
read more »
 
Copyright © 2008 ABS Engineering (PVT.) Ltd. All rights reserved. site Design & Developed by e-creatorz